Hanwha Philly Shipyard

Hanwha Philly Shipyard is transforming the former Philly Shipyard into a major U.S. shipbuilding hub after their acquisition, with plans to modernize facilities, add automation, and dramatically expand ship production capacity. The company has announced multibillion-dollar investments aimed at building commercial ships, liquified natural gas vessels, naval components, and eventually supporting defense and naval programs while significantly growing its workforce.

As part of this initiative, G&A was retained to provide comprehensive due diligence services for potential redevelopment of a 27-acre vacant parcel known as the Girard Point Management Area.  The site will accommodate a significant amount of parking needed to support employee parking.

We provided full property survey, geotechnical investigation, environmental due diligence, and conceptual grading and stormwater management layout.  Because the land was a former incinerator, redevelopment includes extensive restrictions such as leaving the current soil cover undisturbed.  A 3D model was generated to create a heatmap illustrating current and future elevation surfaces which not only minimize any disturbances within the existing cover, but further elevate the site creating a more resilient parking facility situated above the 100-year FEMA floodplain.  We further consulted with various local, state, and federal agencies to determine regulatory permitting required to achieve project entitlements.

Client
Hanwha Philly Shipyard, Inc.

Location
Philadelphia, PA

Contact

Kurt Schroeder, P.E.
Executive Vice President

To further meet the demands of this rapid expansion, we were retained by Bencardino Contractors as part of a design-build effort to convert an underutilized property along League Island Boulevard to construct temporary parking facilities for nearly 700 passenger vehicles for employee parking.  We responded quickly, completing the necessary survey work in less than two weeks.  After discussions with the city developer services committee, it was determined in order to limit permitting and expedite construction, the temporary parking facilities will be constructed over top of existing stone and gravel surfaces and a concrete slab from an industrial building that will be demolished.  This approach limited earth disturbances and removed the need for extensive permitting to achieve an approximately 60-day design-build timeline.

To support their upgrades within the shipbuilding yard, we were also tasked to provide a grading and utility plan utilizing existing drainage facilities connected to a new linear trench drainage to accommodate the 112,000 SF reinforced concrete pad to be used for fabrication of heavy ship block components.  This phase required speed and accuracy to ensure ongoing shipbuilding operations were minimally impacted.  We coordinated this design and construction process with the site contractor. G&A successfully navigated various city agency reviews and approvals which were achieved through a single submission process.