Treatment Plant Capitol Improvements Program

Project Location

Bristol Borough, Bucks County, PA

« back to portfolio
Treatment Plant Capitol Improvements Program

Since 2010 G&A has been assisting Bristol Borough Water & Sewer Authority with planning and implementing extensive capital improvements.  Including the replacement of the heat exchanger and gas safety equipment, pumps, control valves, and sludge mixing system to the sludge digesters;  demolition of the structurally deficient pre-engineered steel control building and replacement with a masonry structure with removable metal roof panels; replacement of the diesel powered standby emergency generators and associated pump station; replacement of the mechanical bar screen and structure at the treatment plant pump station. Additional projects include structural stabilization of failed trickling filter walls and replacement of 2 biological contactors with failed shafts.